Production loop · 11 stations

/loop

1 · What this page is for

Run the 11-station rail. Operator Done issues the station kit. S11 sends the chair to QC — not back on the rail.
S6, S9, and S10 never pull andon. Physical ≠ system is STOP to the supervisor.

2 · At a glance

3 · Main job

Selected · S1

Confirm runs the same Done handler as the station button. Chassis plate 7419055 is WMS-only.

Takt clock

10:00

Paused

Sim paused — takt is frozen. Play the month to run the clock.

Pitch

0

0 on the rail · 0/11 ready · 6 / hour

S1 open — Done on S2 or a pitch pulls the queue.

WIP cap

0/11

0 at QC · 0/3 single build · 0 andon

Pallet → tote break-down

Idle — water spider starts the clock when a pallet leaves bulk; stops when totes land on the loop grocery.

Rail log

Play the day — pitches, andon, and Done will land here.

Bottlenecks

Line is inside takt. No named holds this pitch.

Station balance

Bars vs 10-min takt. Effective minutes include skill and cover. Bottleneck S1 Base Prep.

S1Base PrepOver13 min
S2Electrical & PowerOver12.5 min
S3Chassis Build & LightingOver11.5 min
S4Seating SystemTakt10 min
S5Recline & ComfortOver11 min
S6Cable RoutingUnder7.5 min
S7Controls & ArmsUnder8 min
S8Backrest & HeadrestUnder9 min
S9Final Assembly TouchesUnder6.5 min
S10Accessories & TrimUnder8.5 min
S11Program, Test & ReleaseOver11 min

Tick mark is takt. Arrows move half a minute to the neighbor. Total 108.5 min across the rail.

Andon helpers

No open andon. Cable routing, final touches, and trim never call. Six helpers cover the rest of the rail, QC, and bulk.

Dunnage · off the line

Chassis crate and foam are S1–S3 (and single build). S4–S11 is bags and trim — it does not hold the rail. Empties stack in the yard.

Clear. No open crates on the loop.

Dunnage board

The loop

13 min
12.5 min
11.5 min
10 min
11 min
7.5 min
8 min
9 min
6.5 min
8.5 min
11 min

S1 · Base Prep · empty

Generic rail card

Build begins here with base preparation, motor install, and chassis setup. Verify base unit. Scan & label components. Install motors. Route cables. Prepare chassis & wheels. Dunnage crew pulls the crate — not the station operator. Cart and totes sit behind.

PIC-S1 — no photo yet

  • Verify base unit
  • Scan & label components
  • Install motors
  • Route cables
  • Prepare chassis & wheels

QC

0 waiting

Empty. S11 pitches here.

QC board

Repair / andon

Open

Single-build station. QC fails land here.

Open repair

Shipping

0 on dock

Empty. QC pass lands here.

Ship board

Station work

No chairs on the loop. Kit and load a cart, then advance pitch to seat S1.

Queue — hot first

Queue empty. Every open kit is on a station or in QC.

Station pick list

4 · Extra detail

  • Dunnage crew pulls the crate at S1–S3 — not the station operator.

No chairs on the rail.

After this job → QC · After S11

How we do this job

11 rail platforms, 10-min takt, pitch chain back to S1.

  1. Operator Done issues the station kit and sets ready. Pull walks backward. S1 launches the next buffer cart, hot first.
  2. Andon is for over-takt or a stuck fastener. Cable routing, final touches, and trim (S6, S9, S10) do not pull. Six helpers cover the rail, QC, and bulk.
  3. Dunnage crew pulls the crate at S1–S3 — not the station operator.
  4. S11 Done pitches to QC. The chair does not go back on the rail.