1 · What this page is for

Lead log for who showed up, hourly pace, and labor skill proposals. Cost and sign-off stay on Manager.
A skill proposal does not take effect until the operations manager signs.

2 · At a glance

Shipped today

0/0

0% of day · +0 vs expected

WIP

0

0 rail · 0 QC · 0 dock

Andon open

0

Loop helpers only

Open orders

0

Not yet shipped

Received

0

Units on the dock

3 · Main job

Shipped tue, oct 6 vs 0

0 / 0

0% of day

+0 vs expected 0

Need 0 / hour. Loop at 10-min takt covers 57/day. Single build goal is 3–5 chairs, not the rest of 100.

Showed up today

—

Attendance rollup

This week

—

Year

—

Lost to late / bathroom

0

0 min late · 0 min bathroom

Late to shift

0

Missed 6:00

Late from break

0

8:30 / 2:00

Missed punch

0

On the floor, clock open

Called out sick

0

Today

Vacation

0

PTO today

Bathroom

0

Off the pad

Tied to the day goal

Attendance is clean enough that the rail should hold 10-min takt without extra cover.

Floor today · late, punches, call-outs, bathroom

No attendance exceptions today.

Vacation schedule

No PTO on the book this window.

Adjustment log · Senior Leadership

Every cover, skill proposal, BOM close, and headcount cut the lead and manager made so the day still had a shot at 100. This is the progress pack for SLT — not a timeclock export.

No adjustments logged yet.

4 · Extra detail

  • Single build is 3–5 chairs a day — not the rest of the 100.

No lead adjustments this shift.

After this job → Manager · Sign-off and cost

How we do this job

Lead log for SLT, production pace, and labor skill proposals.

  1. Lead tab: who showed up today / week / year, late breaks and shift, missed punches, sick, vacation, bathroom — and every adjustment the lead made so the day still had a shot at 100.
  2. Leads and the supervisor may propose a skill, level, or cover change. It does not take effect until the operations manager signs on Manager.
  3. Production tab: hourly ships, loop vs single build. Single build is 3–5 chairs a day — not the rest of the 100.
  4. Labor tab: propose skill. Manager signs. Greater skill and ≤1 loop error is what qualifies a builder for a single-build cell.